<< Back to POOL Construction Listing
Looking towards the shallow end. Note: the rock (looks like flag stone) for covering the retaining wall is piled on the left side of the sitting area. That part of the job will be done next. | |
View of the whole pool. A scaffolding walkway was used in the deep end. |