<<Home

[1]     [2]     [3]     [4]     [5]      [6]     [7]     [8]

Master Bath: tiling complete. Plumbing fixtures installed. Still need the glass door and half wall of the shower and tub is still not complete.
Master Bath: sink top is installed, even though the cabinet bottoms will need to be replaced. Faucets and towel holders also installed.